case study
Florida Urology
360 Photo, use the pointer to spin the photo.
What’s Involved?
Client Background: Florida Urology had been operating out of a high-rent location, which significantly impacted their operational costs. By transitioning to ownership of their own building, they aimed to reduce their monthly payments while simultaneously building equity in their property.
Design and Construction: The project involved the construction of an 8,000 square foot medical facility, designed by a professional interior designer who combined a variety of materials to achieve a modern yet natural aesthetic. McCullagh and Scott managed the entire construction process, ensuring the client’s specifications were met with precision and quality.
Facility Features:
- Labs and Workstations: The building includes multiple laboratories and workstations, equipped with state-of-the-art technology to support the medical staff’s needs.
- Waiting and Check-In/Out Area: A large, welcoming waiting area with ample seating, combined with efficient check-in and check-out stations, enhances patient flow and comfort.
- Treatment Rooms: The facility boasts 16 treatment rooms, each outfitted with beautiful cabinetry and seamless flooring to ensure a clean and professional environment.
- Private Restrooms: There are 11 private restrooms throughout the building, offering convenience and privacy for patients and staff.
- Breakroom: A spacious breakroom is available for staff, providing a comfortable space for rest and collaboration.
Design Elements: The interior design features a blend of modern and natural elements, creating a calming yet contemporary atmosphere. The use of high-quality materials and finishes is evident throughout the facility, from the seamless flooring in the treatment rooms to the elegant cabinetry.
Outcomes: By moving to their new facility, Florida Urology achieved significant cost savings, significantly reducing their monthly lease payments compared to their previous high-rent location. Additionally, owning the building allowed them to build equity, contributing to the practice’s long-term financial stability.
Conclusion: McCullagh and Scott successfully delivered a state-of-the-art medical facility for Florida Urology, tailored to their specific needs and designed to support their growth and success. The project exemplifies the benefits of custom-built medical offices, combining aesthetic appeal with functionality and financial prudence.